★★★★★ 4.8 3070 REVIEWS
BOOK A SERVICE CALL
ORANGE COUNTY · DUKE ENERGY SERVES MOST OF THE WINDERMERE AREA · PERMITTED

Electrical panel replacement in Windermere, FL

Windermere homes often have more than one panel, so a replacement here is about how the main, the subpanels, the generator and the chargers work together.

WINDERMERE · TYPICAL INVESTMENT
$2,400 – $4,800

Interior swaps sit at the low end. Exterior meter-main combination panels cost more because the meter can, mast and riser come with them and the utility has to release the meter.

REVIEWS FROM WINDERMERE39
PERMIT OFFICETown of Windermere, or Orange County for surrounding unincorporated areas
WHO COVERS ITGrant and Josh handle Windermere and Dr. Phillips.
WHY THIS PAGE EXISTS

Four things that are only true in Windermere.

If you could swap the city name out of this page and it would still be accurate, it should not exist. Here is what actually changes here.

01

One load calculation for the whole house

Large custom homes with subpanels, multiple EV chargers and landscape lighting at real scale have complex load profiles. We calculate the whole house before deciding which panel actually needs to change.

02

Generator and surge already in place

Many homes here already have a standby generator and whole-home surge protection. A panel replacement has to tie back into both cleanly, and we plan that at the estimate instead of on the day.

03

Lakefront bonding

Butler Chain homes have dock lighting and boat lifts. When we touch the service, we check that the bonding on those circuits is done to standard, because that is where shortcuts tend to hide.

04

Town or county, and the finish

Permits go to the Town of Windermere or Orange County for the surrounding areas, and Duke serves most addresses. Finish gets inspected closely here, so expect correct torque, proper grounding and every circuit clearly labeled.

WINDERMERE PRICING

Real numbers before you call.

Same ranges we publish everywhere, because the work does not cost more just because of the zip code. You get an exact number at the free estimate.

Interior panel replacement
$2,400 – $3,200
Same location, existing feeders and meter can be reused. One day.
Exterior meter-main combo
$3,200 – $4,400
New meter enclosure, mast, weatherhead and utility coordination.
Relocation or full service rebuild
$4,400 – $6,500
Panel moves inside or out, new grounding electrode system, new feeder run.
NO SURPRISES

How the day goes

Grant and Josh handle Windermere and Dr. Phillips. You will have a name and a text before anyone is at your door.

7:45am
Your electrician texts before he pulls up. Boots covered, drop cloths down.
8:15am
Utility disconnect or meter pull. Power is off from here.
8:30am
Old panel out. Circuits mapped and labeled as they come off.
11:00am
New panel set, feeders terminated, lugs torqued to spec, grounding and bonding corrected.
2:00pm
Circuits landed and labeled — properly, not in pencil. AFCI/GFCI where code requires.
3:30pm
Power back on, every circuit tested. Inspection scheduled by our office.
Next day
Inspector visits. We meet him. You do not have to be home.
VERIFIED CUSTOMER REVIEWS

Real reviews, word for word.

ALL 3070 REVIEWS →
★★★★★
HomeAdvisor

"After getting the run around from other electricians I came across In Phase. Wish I found them first."

MARK B. · SERVICE UPGRADE · FEB 2025
★★★★★
HomeAdvisor

"Unlike some of their competitors, they don't try to up-sell products that aren't strictly necessary."

RYAN D. · PANEL UPGRADE · MAR 2026
★★★★★
Google

"Our old panel dated back to 1984 and was overdue for replacement. We worked directly with Keylin, who was outstanding from start to finish."

LAUREN P. · PANEL UPGRADE
★★★★★
HomeAdvisor

"…tried to over charge for work that was not even necessary. In Phaze offered an alternative option at a fraction of the cost."

KEITH Y. · PANEL UPGRADE · AUG 2025
QUESTIONS WE GET IN WINDERMERE

Straight answers.

What is the difference between an interior and exterior panel replacement?

An interior load center lives in a garage, hallway or closet and is usually the simpler job. An exterior meter-main combination panel sits on the outside wall with the meter, so it involves the meter can, the mast and the utility — more parts, more coordination, more cost.

Do I really need 200 amps?

Not always. If you are not adding load, a 100-amp service in good condition can be fine. We do a load calculation first — if the answer is no, we say no.

How long is the power off?

Typically six to eight hours in one day. We schedule it in the morning so you are back on by dinner.

Who pulls the permit?

We do. Our office files it, schedules the inspection, and meets the inspector. You handle nothing.

Will you patch the wall?

Yes. If we open drywall we close it. That is part of the job, not a change order.

Is a Federal Pacific panel really dangerous?

Stab-Lok breakers have a documented failure-to-trip rate. We will show you what is in your panel and let you decide with real information.

★★★★★
3070 reviews.
Earned one job
at a time.

Panel replacement in Windermere, done right.

Free estimate. If you do not need the work, we will tell you — which is why people in Windermere call us back years later.

★★★★★ PANEL REPLACEMENT · WINDERMERE · FREE ESTIMATES
BOOK ONLINE CALL