Orlando is two electrical cities in one, and which one you live in decides whether this is a capacity job or a remediation job.
Interior swaps sit at the low end. Exterior meter-main combination panels cost more because the meter can, mast and riser come with them and the utility has to release the meter.
If you could swap the city name out of this page and it would still be accurate, it should not exist. Here is what actually changes here.
Inside the city core you are on OUC; further out it is Duke. They release and reconnect meters on different timelines, and that — not the permit — is what sets your schedule. We tell you which at the estimate.
A garage load center is the simpler job. An exterior meter-main combo brings the meter can, mast and weatherhead with it, which is why those quotes land higher.
College Park, Delaney Park and Conway were wired before central air. A panel swap is often only half the honest answer — sometimes the grounding electrode system is the real problem.
Newer builds sized to the code minimum of their year, now absorbing a charger, a pool heater and a second AC. A load calculation usually settles it without a service upgrade.
Same ranges we publish everywhere, because the work does not cost more just because of the zip code. You get an exact number at the free estimate.
Grant and Victor cover most of the city core. You will have a name and a text before anyone is at your door.
"After getting the run around from other electricians I came across In Phase. Wish I found them first."
"Unlike some of their competitors, they don't try to up-sell products that aren't strictly necessary."
"Our old panel dated back to 1984 and was overdue for replacement. We worked directly with Keylin, who was outstanding from start to finish."
"…tried to over charge for work that was not even necessary. In Phaze offered an alternative option at a fraction of the cost."
An interior load center lives in a garage, hallway or closet and is usually the simpler job. An exterior meter-main combination panel sits on the outside wall with the meter, so it involves the meter can, the mast and the utility — more parts, more coordination, more cost.
Not always. If you are not adding load, a 100-amp service in good condition can be fine. We do a load calculation first — if the answer is no, we say no.
Typically six to eight hours in one day. We schedule it in the morning so you are back on by dinner.
We do. Janzie files it, schedules the inspection, and meets the inspector. You handle nothing.
Yes. If we open drywall we close it. That is part of the job, not a change order.
Stab-Lok breakers have a documented failure-to-trip rate. We will show you what is in your panel and let you decide with real information.
Free estimate. If you do not need the work, we will tell you — which is why people in Orlando call us back years later.